Education

Southwark Council.

St Thomas' The Apostle College, Peckham

Client: Southwark Council
Project Value: £400,000
Duration: 8 months

Download info sheet View more info

We were appointed sub-contractors by Balfour Beatty to carry out internal refurbishments of a school block on behalf of Southwark Council between March 2012 to October 2012.

In that time we carried out the various following works:

  • Complete soft strip demolition.
  • Drainage.
  • Screeding.
  • Roofing works.
  • Structural works.
  • Drylining.
  • New Brick and block work (internal and external).
  • Bathroom refurbishment.
  • Insulation works to meet part L.
  • Suspended ceilings.
  • Carpentry/Joinery works.
  • External brickwork repairs.
  • Damp proofing works.
  • Laying tarmac surfaces.
  • Internal decorations to block, and external decorations to steelworks.

Discovery New School.

DNS, Broadfields, Crawley

Client: Discovery New School
Project Value: £290,000
Duration: 3 months

Download info sheet View more info

We were appointed sub-contractors by Balfour Beatty to carry out all aspects of building works to a grade 2 listed building which was to be turned into one of the first ever Free Schools to open in the country.

  • Building an equipment store from start to finish.
  • Installation of steels.
  • Removal of internal walls/ Forming openings.
  • Appointing specialist fabricators to design and install canopy/glazed balustrade.
  • Upgrading building to suit fire regulations.
  • Structural repairs to veranda.
  • 1st fix and 2nd fix carpentry.
  • Damp proofing works.
  • Roofing works.
  • Lead work.
  • Drainage.
  • Tiling works.
  • Flooring through out.
  • Insulation works to part L.
  • Decorations.