R Benson plasterer

The project saw us obtaining security clearance to work within an operational MOD base on the Purbright army barracks refurbishment, with company details added to the Ministry of Defence database for future works.

Works consisted of refurbishment and a new build of existing office accommodation, as well as alterations of the changing room areas to the new offices and personnel training rooms, along with external works such as roofing and windows and doors.

This was a design and build project with a constantly moving requirement from the start and included the following works:

  • Soft strip out.
  • Structual works.
  • Building alterations.
  • Working off designs/drawings.
  • Extensive plastering works.
  • Complete internal/external decorations.